Site Search:

WinDaq System Used in Bridge Monitoring

FacebooktwitterredditlinkedinmailFacebooktwitterredditlinkedinmail

The I-35W Mississippi River Bridge in Minneapolis, MN connects Downtown East to Marcy-Holmes. Following its catastrophic failure on August 1, 2007, a decision was made to rebuild the bridge with a state-of-the-art monitoring system. The contractor chose DATAQ Instruments hardware and software for the job due to our expertise in distributed and synchronous data acquisition technology. Since the bridge’s reopening on September 18, 2008, DATAQ Instruments hardware and software have played a vital role in monitoring bridge health, a contribution that was recently featured in a Minneapolis news report, which you can find here.

Additional Reading:

Bridge Structural Monitoring System

 

Follow Us
FacebooktwitterlinkedinyoutubeFacebooktwitterlinkedinyoutube

 Categories: Data Acquisition, Synchronous



 Bookmark the permalink

 RSS Feed (comments for this post)

 Post a comment

 Trackback URL

Post a Comment

Your email is never published nor shared. Required fields are marked *

*
*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>